Showing posts with label Positive results from 2014 outside assessment review of Nord Stream pipeline. Show all posts
Showing posts with label Positive results from 2014 outside assessment review of Nord Stream pipeline. Show all posts

Monday, July 6, 2015

Positive results from 2014 outside assessment review of Nord Stream pipeline

Nord Stream has finished an outer examination of the two pipelines. The occupation was executed utilizing a Remotely Worked Vehicle (ROV), furnished with advanced cameras, particular sensors and worked from a committed bolster vessel. The visual and instrumental (geophysical) review was performed all in all length of the pipelines through the Baltic Ocean.

The target of the examination overview was to gather astounding information to evaluate the respectability of the two pipelines through the investigation of a few variables: exact position of the pipelines (vertical and even), profundity of internment into the seabed, conceivable free-compasses, state of the cathodic security framework, confirmation of existing links and pipelines intersections, status of mediation works (settlement berms).

The outcomes affirm that the pipelines are still in a time of settlement, not surprisingly, and that all progressions are in concurrence with the outline parameters.

The ROV additionally recorded the position of social legacy locales in the region of the pipelines, and affirmed that the destinations were not influenced by the vicinity of the Nord Stream structures.

The overview was led in the middle of May and November 2014 and it is wanted to be performed again in 2015.

For more data, please visit : http://www.nord-stream.com

Popular Posts

Featured Post

Die Ausweitung der Vereinbarung wird sicherstellen, dass wichtige Lieferungen von dringend benötigten Energie weiterhin auf den Weltmarkt Zubird erreichen", sagte O'Reilly

Königreich Saudi-Arabien und Chevron verlängern PNZ-Betriebsvereinbarung thirty Jahre Montag, 15. Sept 2008 Die Chevron Corporation (NYSE:...